Development Finance

Ground-Up Development Finance - Build from Land to Completion

Ground-up development finance covers the complete build cycle - from the day 1 land purchase through planning, construction and practical completion. Lenders typically advance up to 65% of Gross Development Value (LTGDV) and up to 85–90% of total project cost (GDC), with build funds released in tranches as construction progresses. We arrange development finance for residential, commercial and mixed-use schemes across the UK.

Max LTGDV65%
Max GDC funded85–90%
Rate from0.90% pm
Land day 1Yes

How Ground-Up Development Finance Works

A ground-up development loan is structured in two parts: the land element (drawn on day 1 to complete your land purchase) and the build element (released in tranches as construction milestones are certified by a monitoring surveyor). This means you are only paying interest on funds as you draw them, not on the full facility from day one.

  1. 1

    Day 1 - Land Drawdown

    Funds to purchase the land drawn on completion. Typically 60–65% of open market land value. Day 1 land purchase is included in the facility.

  2. 2

    Months 1–3 - Pre-Construction

    Pre-build Architect, structural engineer, planning conditions discharged, contractor procurement. Professional fees can be included in the facility.

  3. 3

    Months 3–18 - Construction Tranches

    Build costs released monthly or at agreed milestones following monitoring surveyor inspection. Each tranche certified against the approved schedule of works.

  4. 4

    Practical Completion - Exit

    Loan repaid from unit sales, development exit finance, or long-term commercial/residential mortgage. Final retention released on sign-off.

Key Lending Metrics Explained

LTGDV - Loan-to-Gross-Development-Value

LTGDV is the ratio of your total loan (land plus build) to the projected end value of the completed scheme. Most lenders cap this at 60–65%. At 65% LTGDV on a scheme with a £2m GDV, the maximum total facility is £1.3m. If your total costs exceed this, you fund the difference from equity.

GDC - Gross Development Cost

GDC is the total cost of the scheme: land purchase price, build cost, professional fees, finance costs and contingency. Most lenders will fund up to 85–90% of GDC, meaning the developer's equity requirement is 10–15% of total costs. This equity must be injected before or alongside the lender's funds.

Development Finance Rate Table

Ground-Up Development Finance - Indicative Rates October 2026
Scheme TypeRate (per month)Max LTGDVMax GDCTypical Term
Residential (1–4 units)0.90–1.1%65%90%12–24 months
Residential (5–20 units)0.95–1.2%65%85%18–36 months
Residential (20+ units)1.0–1.3%65%85%24–48 months
Mixed-use1.0–1.25%60%85%18–36 months
First-time developer1.1–1.4%60%80%12–24 months

What Lenders Look For

Development lenders conduct thorough due diligence. The main areas assessed are:

  • Developer track record - completed projects of similar scale and type. First-time developers can access finance but at higher rates and lower leverage.
  • Planning permission - full planning permission is required by most lenders. Reserved matters and conditions must be dischargeable within a reasonable timeframe.
  • Build cost - a detailed schedule of works and fixed-price building contract (JCT or NEC) are typically required. Lenders want comfort that the cost plan is robust.
  • Contractor quality - lenders assess the contractor's experience, financial standing and insurance position.
  • GDV evidence - independent RICS valuation required, assessing projected GDV on an "as complete" basis.
  • Exit strategy - sale, development exit loan or long-term mortgage - must be credible and supported by market evidence.
Same working day

Get terms for your own case

The figures on this page are indicative. Send us your scenario and we will come back the same working day with options from our panel of 130+ lenders.

0204 6211776

Whole of market · 130+ lenders · FCA 814533 · Same working day response

FAQs

Frequently asked questions

What is ground-up development finance?

Ground-up development finance funds the complete process of building from bare land through to completed units - covering land purchase, professional fees, build costs and contingency. It is structured as a tranched facility, with drawdowns released as each construction milestone is certified by a monitoring surveyor.

What does LTGDV mean and what is the maximum available?

LTGDV stands for Loan-to-Gross-Development-Value - the ratio of the total loan to the projected end value of the completed development. Most development lenders will lend up to 60–65% LTGDV. Some will stretch to 70% on schemes with pre-sales or very experienced developers.

What is GDC and what percentage of it can be financed?

GDC stands for Gross Development Cost - the total project cost including land, build, professional fees and finance costs. Lenders typically fund up to 85–90% of GDC, meaning the developer needs to inject 10–15% of total project cost as equity.

Do I need planning permission before applying for ground-up development finance?

Yes. Most ground-up development lenders require full planning permission to be in place before they will issue a formal offer. Some will consider conditional planning or applications pending, but terms will reflect the additional risk.

Can development finance cover the land purchase on day 1?

Yes. A ground-up development facility typically funds the land purchase on day 1 and then releases build costs in tranches as the construction programme progresses. The land element is assessed as a percentage of the land value, typically up to 60–65%.